All of you are requested to join us at get-together snacks party on 15 August 2009 . We will discuss all mutual issues at the venue with Ashiana.
You have to deposit Rs. 50/Per Person. Deposit Details will be confirmed soon.
Time @ Party starts = 1PM.
MAY Comments Archived
Ashiana Palm Court My Dream Home said...
ReplyDeleteList of Members of Blog:
Apuri
Ajay 9871393960
APC
Ankush Sharma
Anjana Malik
Abhinav P1-405
Amit Saxena 9212105700 P4 422
Anand P2 A - 409
Alok Barnwal
Bhanu Praksah
Bhanu dabral P3 116.
Col Arvind Mathur P1-705 9810511529
Deepak P2 A311
Dheeraj Rajpal 9930063668
Edward Thompson 9312945554
Gaurav 9873179790 P1 Flat No 304
Indrajit Sen
Manmeet Singh Ground floorP1 919899171252
Nitin 9717398310 p4 519
Parag Sarin P4 4th floor
Pankaj Chamoli 9873913635
Rrishikesh
Rohit Walia P1 302
Rohit Das P2 A-212
Richa Ghosh
Radhika Sachdev
Dr. Rahul Dass P2 A-412
Dr. Zafar A. Zaidi P2 - 608
Rahul p1 9th floor
Ramu 09313229091
Rishu Anand P3 816
Sunit Yadav 919818308015 P4
Sumit Minocha P2 A909 09350531017
Sanjay Aggarwal P4 Flat no-321
Shivendra S Chauhan P2911 and 912 9971900424
S Ganesh Kumar +9997299921 P4 A-924
Shashank Gupta
Vikrant Verma 9310311179
VN Gupta P3
Vikram Bhatia P4 622
Members Confirmed for 15 August till date
Col Arvind Mathur
Edward Thompson
Sunit yadav
Indrajit Sen
Shashank Gupta
Vikrant Verma
Nitin Jain
Pankaj Chamoli
Manmeet Singh
Sumit Minocha
List of Issues and Volunteers assigned for further pursuing :
Volunteers needs to further investigate the status and solutions for their concerned areas.Volunteers can cordinate with each other in their teams and see which team stands first in race.
1.Issue: Quality of Construction
Volunteers : Sunit Yadav 919818308015 P4,Sumit Minocha P2 A909 09350531017,Shashank Gupta,Vikrant Verma 9310311179,VN Gupta P3,Nitin 9717398310 p4 519,Vikram Bhatia P4 622 ,Pankaj Chamoli 9873913635, Dr. Rahul Dass P2 A-412
2.Issue: Basic Amenties
a:sewer
b.Water
c.Electricity
Volunteers : Bhanu Praksah,Bhanu dabral P3 116,Col Arvind Mathur P1-705 9810511529,Deepak P2 A311,Rishu Anand P3 816,Sanjay Aggarwal P4 Flat no-321,S Ganesh Kumar +9997299921 P4 A-924,Amit Saxena 9212105700 P4 422
3. Issue: Schools
Volunteers : Richa Ghosh,Radhika Sachdev,Ramu 09313229091,Dr. Zafar A. Zaidi P2 - 608,Edward Thompson 9312945554,
4. Issue: Security
Volunteers : Rrishikesh,Rohit Walia P1 302,Rohit Das P2 A-212
5. Issue:Transport System
Volunteers :Gaurav 9873179790 P1 Flat No 304,Indrajit Sen,Manmeet Singh Ground floorP1 919899171252
6. Issue:Possession date for all towers
Volunteers :Anjana Malik,Abhinav P1-405,Shivendra S Chauhan P2911 and 912 9971900424,
7. Issue:Any other issues e.g. GDA Status for Ashiana
Volunteers : Apuri,Ajay 9871393960,APC,Ankush Sharma,Anand P2 A - 409,Alok Barnwal,Rahul p1 9th floor,Parag Sarin P4 4th floor ,Dheeraj Rajpal 9930063668,
Our mail id is apcwf@hotmail.com.
ReplyDeleteAnkur Jaiswal said...
ReplyDeleteHi All,
By the Blog writings it seems that the construction quality is relly being compromised. Moreover even i had a talk with one of the represnetatives of ashina in Palm court where he has confirmed that the completeion is delayed.
He also gave me a hint that it might take even June2010 to get completed by saying that 'Sir..aapko shift karne do teen mahine lag jaayenge so june tak ka time buffer le ke chaliye/'
Ankur Jaiswal(P-2,809)
9971150049
Please do fill up construction quality status in ashiana website, if u are unhappy. This will be required for documentation purpose in future.
ReplyDeleteAll members are requested to fill the form to protect their rights.
http://www.ashiana.co.in/Construction_quality.aspx
Nitin
ReplyDeleteI have spoken to one of guy in Ashiana and they say that all things are going good in regards with sewer,water and electricity.
P1 and P2 are going to be ready by march 2010 and p4,p5 by June2010
New Photos posted on ashiana care
ReplyDeleteGuys, if want to change the party date, please post here the alternative dates.
My Dear friend
ReplyDeletei visited ashiana Palm Court last weekend.
i met ther ashiana officials and discussed all issues were on my mind. construction is on full swing and they are in touch with GDA. Project completion is on time.
plaes update if any change on this
Dear All,
ReplyDeleteI had visitied Ashiana on 26th June 09 They have started building the roof of 12th floor of Tower P1 & P2. Tiles of Common Bathroom of each flat have been completed upto 3rd floor.
Egarly waiting for 15th Aug for the party.
Hi guys
ReplyDeleteAnyone of you wants to own the responsibility of arranging party and collecting money ?
If yes, please provide your name.
Party will having only 3 variety of snacks and a cold drink/tea/coffee and expense is maximum Rs.50 pp.
Anybody interested to sell his flat?
ReplyDeleteOne of my friend is interested to buy
Your Dream Home
ReplyDelete15 renowned names of the real estate industry are promoting Rajnagar EXtension with their affordable yet luxurious housing projects
FOR IMMEDIATE RELEASE
PRLog (Press Release) – May 28, 2009 – New Delhi: Finding a home that fits into your modest budget may look like a dream, but it may not be impossible anymore as Raj Nagar Extension on NH-58 is the upcoming budget lane for the buyers. This place solely caters to the middle class stratum of the society .Budget homes being the new buzzword led to the formation of Raj Nagar Extn. (NH 58) Builder's association, a collective effort of 15 renowned names of the real estate industry to promote Raj Nagar Extension as an impending connoisseur's delight for those who wants to own a dream house of their own.
The place enjoys the status of being NCR's most well planned city having high connectivity with Delhi as well as Noida (15 min. drive), Greater Noida (35 min.), Vasundhara (10 min.), Indirapuram (10 min.), Vaishali (10 min.), Meerut and Hapur (40 min.). Not only this! The other major development taking place is the construction of six -lane expressway connecting G.T. Road with NH-58 which eventually goes straight to Dehradun via Meerut apart from the metro rail which is on the verge of knocking the doors of Raj Nagar Ext. (NH-58), which surely will help the customers at large.
The Association comprises the who's who right from Ashiana homes, SVP, SG Estates, Landcraft, KDP Infrastructure Pvt. Ltd., Shreya Developwell Pvt. Ltd., Shree Energy Developers Pvt. Ltd., Ajnara Farms & Services, Ascent Buildtech, Nitishree to upcoming developers like High End Infratech, Krishna Asset Reconstruction, MCC Builders, Quantam Buildwell Pvt Ltd and Shomit Finance Limited.
According to Mr. Manu Garg (Spokesperson, Raj Nagar Ext. (NH-58) Builder Association), “The initiative taken by each builder of the association has out stepped the clichéd notions of lifestyle. The new era demands modern amenities and luxurious living but at affordable prices thus that being the sole reason of this joint effort of promoting Raj Nagar Extension as the next budget lane”.
Raj Nagar Extension is a one stop destination for the clientele where they have wide variety to choose from right from a 1BHK ranging from Rs 12 lacs to a 3 Bhk of 40 lacs with amenities likes Entertainment Zone, Shopping Paradise, jogging tracks, in other words you name it you have it there and the icing on top being their unique affordability plans through tie ups with banks like HDFC, ING, Axis, UBI, ICICI, LIC Housing and SBI etc thus cutting down all the add on burdens from their customers minds and as well as their pockets…
For Further Media Query Please Contact:
ICPAR
A Division of Planman Marcom Pvt. Ltd.
Mr.Prateek Khandelwal
ICPAR – Delhi
Planman Marcom
9990639343
Most Well Connected City in Delhi NCR.
ReplyDeleteSchool : 0.8 KM
Hospital : 0.9 KM
Gym : 1.7 KM
Multiplex : 1.2 KM
Restaurant : 1.3 KM
Amusement Park : 1.2 KM
Friend's Home : 2:0 KM
Supermarket : 1.8 KM
Kid's Tuition Center : 1.1 KM
Car Service Centre : 2.5 KM
Uncle's Home : 2.2 KM
Wouldn't life be nicer if every destination of life scales in such distances... considering the very same idea in mind we are presenting RAJNAGAR EXTENSION. This is one of the Delhi NCR's most well planned city which has highly connectivity with Delhi as well as Noida, Greater Noida, Vasundhara, Indirapuram, Vaishali. And even more 6 lane expressway construction work also has been commenced. This city is pollution free, serene and affordable too. RAJNAGAR EXTENSION is only 15 min distant from Delhi Border, as well as other Delhi surrounding also can be reached only within 15-20 minutes. The city will have all the ultramodern facilities including shopping complex, multiplexes etc. in its surrounding. Thus you can remain easily connected with all the modern amenities you always chreished for. So let your desires to connect with its destination in the most well connected city in Delhi NCR RAJNAGAR EXTENSION.
U.P. Govt. has prepared draft plan U.P. APARTMENT ACT 2009 and due approval by cabinet has been granted .
ReplyDeleteMain highlights are
(i) Provision has been made to provide all copies of important documents to buyers by promoters.
(ii) If delay in completion of project, builder will be penalized for the same and vice-versa to buyers if delay in payment
(iii) Formation of Association of Apartment Owners are compulsory for usage of common area and maintenance
(iv) And much more………..
If copy of above act is available with you kindly provide
I just checked the construction status on Ashiana care website. for P2 they uplaoded the same photp on 17/06 and 09/07. So either there is no update or by mistake the photo is the same.
ReplyDeleteSame is with P4.
ReplyDeleteI am not sure how many are aware of this fact, but today i checked the Price list of Ashiana palm court at their site and there they have extended the possession date. Now for P1, P2, P3 its June 2010 and for P4, P5 its September 2010. This is really ridiculous. How they can extend the dates. This will impact our pockects. We are paying huge rents in near by areas - Noida, Delhi and by extending the possesion this will hurt our centiments too.
ReplyDeleteHi, I have booked a flat in P2. need to know which bank is better for home loan. Could someone please guide. (hdfc or ICici or any other)best regards. arun
ReplyDeletefinding of this blog site during random search on google gives me an immense pleasure.It gives me a feeling and excitement of getting new neighbours and a place for share the things,issues with the people of same house.
ReplyDeleteMyself RAJKUMAR and has recently booked one flat in P-4 tower.Flat No. is 219 and Mo :-9818007789.
Hi All,
ReplyDeleteI've booked the flat in tower P4 - 821. Also please add my name to list.
Was there the meeting on 15 Aug?
Please update on the issues discussed.
Regards,
Ashutosh.
09873401237
Hello All,
ReplyDeleteIs there any progress on 45 Mtr wide road taht has to be passed from main entrance of Ashiana Palm Court.
I have visited the site 1 month back and that time ashiana executive told me that demarcation is in progress.
Ashutosh.
I've booked the flat in tower P3 - 214. Also please add my name to list.
ReplyDeleteI booked but still I have a fear about developement of soroundings and safety while moving to/from Palm Court in night times.
hi all,
ReplyDeleteI am pradeep booked the flat in p4 623. add me also in your list mob. no. 9213793211
Can't the final list be put here after adding all the names alongwith contact number and valid mail id that will be easy for us to be in touch.
ReplyDeletePradeep ( Mob. 9213793211)
P4 623
singhp28@rediffmail.com
hi
ReplyDeleteI am Rutwik booked a flat at P3, 318.
please add me.
rutwikpanda@gmail.com
hi ..to all,
ReplyDeleterecently i have purchased a flat in p-3
please add me in your list also.
what u think about this project? is it worth?
at the site officials saying that possesion in sept ..is that true?
I have booked flat in P2 511 is the flat no. Please add my name in this blog
ReplyDeletemanishvarsha@yahoo.com
How is the construction going on, is there a way to get possession in June2010?
Also if it happens in June there will be delay of 6 months so will they give a penalty
Also I found they have increased the amount and for AMC etc. it's saying to be decided at possession whereas when I booked this in 2007 they have already charged me fixed price so not sure what this means to be decided at the time of possession.
I booked flat seeing Ashiana name and goodwill in Indirapuram should I still continue with that feeling OR I should feel that Ashiana is also another name in cheating his clients?
Please response back to me on manishvarsha@yahoo.com if you guys have more information on this. It will be highly appreciable.
I have a flat in P2 1st floor. I would be interested in selling it in near future.Any idea what would be the giong rate??
ReplyDeletep2 ist fllor ..going rate is 25 lac complete package
ReplyDeleteto u all..possesion is delayed upto october 2010..for towers p1,p2,p3 for p4,p5 it is dec 2010..this is confirmed news from aasiyana authorities...lets fight back
ReplyDeleteI am not sure if they will be able to give possession by January 2011. I use ti visit site onec in a month and see no progress.
ReplyDeleteHi!
ReplyDeleteI'm Anandji. Booked a flat in P3-913. Ashiana people assures to give posessions by June 2010. Please enlighten if someone knows better.
Hi ALL
ReplyDeletethis is Manoj Tyagi From Property Hub India A leading Real Estate Consultant Company in rajnagar Extn., if any body wanna invest in rajnagar extn.or wanna buy a home in rajnagar extn. you can call me round the clock.you can visit us on www.propertyhubindia.in
Manoj Tyagi
09650196678
9350196678
I recently visited Ashiana, the manager told me that the possession will start in June 2010 however I agree to few above messages that before Oct 2010 OR Jan2011 the builder will not be able to give possession. Also I came to know that there is no Penalty clause signed by Builder and the person whom I met in office said that in this crisis situations when lot of companies in world are dying, Still 6 months of delay will not be considered as Delay. With this thought in Mind I do not believe Ashiana will meet June2010 possession date, please check your property papers and let me know if there will be any penalty beared by Builder due to Delay in construction?
ReplyDeleteThanks,
Manish
9910024239
There is no penalty clause in papers. Ashiana says, because of thier good report in market they never delays thier projects.
ReplyDeleteFor KDP Grand Savanna Raj Nagar Extn owners:
ReplyDeletehttp://kdpgrandsavanna.blogspot.com
Ashiana flat holder are silent?
ReplyDeleteHELLO EVERONE....WHEN IS THE POSSESEION?
ReplyDeleteAshiana says they will start sending possession letter by June 2010.
ReplyDeleteAshiana says they will start sending possession letter by June 2010.
ReplyDeleteAnd now they are uploading old pictures under new dates...they think we are stupid...and will buy that...lets take them to task....
ReplyDeleteASHIANA IS DELAYING TH E POSSESION TO NEXT YEAR..WE HAVE TO BE UNITED TO FIGHT BAVK
ReplyDeleteForget about possession. This builder is going to be another fraud and cheat builder.
ReplyDeleteTry to save your money please.
What Proof do you have that Ashiana is Cheat & Fraud builders.
ReplyDeleteThey had March10 as possession date/month and increased it by 3 months. They don't have any penalty clause in allotement letter. ( We asked to Ashiana about this but they said they have good will in market and no need of this. DOn't worry). Now we have to worry about this.
ReplyDeleteStill they are planning to give possession by end of this year. Can you accept this? Delay by 9 months!!!!!
They have reduced thier labour and now progress of project is very slow. They are doing nothing on connecting road to Palm Court (how you will reach there?)
If we will spread negative about Ashiana. Will this really help us?
ReplyDeleteI know, they are delaying possession but I don't think that no one
amongst us will ready to live their , if they would immediately
provide us possesion because surroundings are not developed as well.
Better is to talk with them straight forward and make out some commitment from them.Spreading negative about them on Net will hurt us only in
long Run.
IF WE GET PSSESION ..IT WILL BE BENEFICIAL FOR US TO GIVE IT ON RENT...SO THAT WE CAN AFFORD OUR IMPENDING EMI,S.. INTEREST .RATE IS GOING TO RISE
ReplyDeleteWho will take your flat on rent w/o basic things like sewer, water, connecting road to palm court etc. We need to force them to complete these first.
ReplyDeleteevery body is moving to noida ...big projects are there to come ..everyone has left rajnagar ext. hats why they have delayed these projects
ReplyDeleteVery Good News , Dilshad garden Metro is expending upto ALT centre via Raj Nagar Extn. Work will start shortly :)
ReplyDeleteTHIS MESSAGE IS FOR GUY, WHO HAS POSTED A MESSAGE ABOUT MOVING TO NOIDA
ReplyDelete===============================================
So, are you moving yourself or your flat if you have purchased, phyisically to Noida using latest technology?
Do you know the possession period at Noida. Many projects have just started and will be ready in next three years only.
They are selling flats in AIR, so have you taken one in AIR and will live in that?
SINCERE REPLY TO MY FRIEND WHO HAS ADVISED ME 4 NOT GOING TO NOIDA
ReplyDeleteU HAVE PURCHASED A FLAT HERE, I HAD TOO,WE R STUCKED HERE..BUT STIILL I BELIEVE FUTURE IS IN NOIDA ...CONECTIVITY..SECURITY ..EVERTHING IS THERE ONLY...U CANT EVEN IMAGINE IT IN U.P.
very negative...
ReplyDeleteI have booked just now...
If I know above things then I'll never book it.. :(
ReplyDeleteDon't wory man. Some people are just here to make people feel bad about thier decission. In Noida, all buliders will give possession in next 2 years (minimum)only and curently they are selling flats in air (virtual flats)
ReplyDeleteAlso, check NCRB records, crime rate is high in NOida than GZB.
latest news.... connecting road from rajnagar ext to meerut is halted as farmers are not willing to surrender thir land
ReplyDeleteOld News , Now this issue is resolved & work is in progress.GDA has already invested crores of Rs. for that 6 lane express highway(Impossible that it would get stuck in this manner)
ReplyDeleteWe r on the brink of June...promised possession date(after months of delay)....will smone @ Ashiana plz tell us which YEAR. June happens every yr.
ReplyDeleteIt is my flat,my society and I am proud of my decision to buy a flat here.
Plz do not deflate the balloon of my dreams.
Let's hope for best. I just want to know that how many families will come to stay at Ashiana if they give possession by June / July as this time will be mid-session for thier child's school.
ReplyDeleteThere is no place having neme Noida Ext. exist in the record of Authority. All are making fool there. Who knows what will happen after 3 years of now. Our Palm Court project is ready and have trust till oct 2010. This project will have good Premium over all projects running in Raj nagar Ext. Ashiana is brand.
ReplyDeleteAll are requested to go on this link
ReplyDeletehttp://www.ashianaupvan.com/Files/Letters/20100305-AURWA%20Letter%20to%20GDA%20for%20Stores-v1.0.pdf
It may happen with us also
Ashiana has extended possession for all tower to November 2010
ReplyDeleteIts not true in case of P-1 and P-2.
ReplyDeleteI am planning to book a flat in Ashiana Palm Court.Pl tell me the price after bargain
ReplyDelete24-26
ReplyDeletewhich floor you are going to book. whether it is park facing?
ReplyDeleteIt's true for all towers including P1,P2 & P3.
ReplyDeleteVisit Ashiana site office and read the new conditions in Price List.
No , Just see with open eyes for tower p1,p2 & P3 Possesion they have written on June 10 & for P4 & P5 on September
ReplyDeleteI can say that you are seeing in thier internet site. They have printed new Price List and giving with new brochure. They are clever and hence not updated in ineternet page.
ReplyDeleteJust visit thier site office and you will come to know that I am right. I have visited last saturday and found this.
all builders in raj ngr extn. are delaying completion.all brokers made falls commitment to sell off flats.(like mcc developers mentioned of green area in front of their project, where construction work of builder has been started). asiana,quantum has also changed their plan w.r.t. their brochure. it will take at least one year to start commercial activity in the area
ReplyDeletePlease go through below link. For metro rail in Rajnagar extn.
ReplyDelete---------------------------------------------
http://blog.propertynice.com/survey-start-for-raj-nagar-extension-metro-rail/
Any Updates on Possession & Construction?
ReplyDeleteI hv listened that Construction of 6 Lane road has been started & it will be completed within a month
Has anybody visited site on Last Weekend?
I visited last weekend. Yes..last part of six lane link road (NH58 end) is in progress.
ReplyDeletePossession is still not sure..may be Sep10
Anonymous said...
ReplyDeleteI have booked a flat in 2007 on first floor under DP payment scheme when I was told that apartment will be of 10 storey only.Since then I have never been at site.I just keep my self updated by going through Ashiana site as well as this blog.
Can any body tell me how far (approx distance) the site is from 6 lane link road.
Is there any other commercial building also under construction.
Distance of 6 lane Link road From NH 58 and other side is 600 mtr
ReplyDeleteby when we will get the possession? 6 lane road will be completed in a months time as per the newspapers. What is the status of 45 ft road in front of the project. How will we reach untill and unless that road is constructed..any body has any news regarding this..
ReplyDeleteI have a flat in KDP.
ReplyDeleteIn starting of 2009 i was confused btween ashiana & kdp & my decision was wrong at that time. It may be possible that ashiana has delayed the possession but they are very near to possession. i have visited ashiana site 3 times & i feel that the construction & progress of construction of ashiana is far better than any other projects in raj nagar extn.
Now my brother wants to buy a flat & i have suggested him ashiana without any other option.....
Ashiana has started sending possession letters for tower P1,P2 & P3. They will start giving possession by 01-09-2010
ReplyDeleteHi All,
ReplyDeleteI am trying to write some of main issue here. Please add to this and we can discuss together.
1. Connecting road still not there from Palm court to Main 6 lane road.
2. No electricity connection is there from electricity board to palm court.
3. No water connection is there from Nagar Nigam to palm court.
4. Project work is still pending at ground level (E.g. internal roads, park, club, parking slots, Tower outer painting etc.)
5. Lifts still not installed and stairs are also pending
6. Main gate of palm court is still not ready
7. Club construction still not started
8. Tiles inside flats are not leveled properly (I believe this issue is with most of the flats.
9. Above and all, commercial activities not started yet in Rajnagar extension. We can't live there untill this start (E.g. how to get milk, gas, daily need goods etc in that area)
10. If no commercial activities, then No public transport, No school buses will be coming to this area.
I don't thing it will be easy to live there w/o above some points are full filled.
S Kumar
yes, yes.
ReplyDeletebefore getting possession we should cure all the defects and lacuna. This is the crusial time, as once the builder received all the money, there is little chance of the builder to listen our heeds.
beside the above we all have to collect some important documets, like original sale deed of the land, GDA approval letters, sketches of electric, water, gas and fire safety lines. etc. The no due certificate from various authorities, like PWD, Electric, GDA etc. These documents are vital for our palm court residential socity.
ReplyDeleteHi,
ReplyDeleteI have bought a house in Ashiana Le residency...can anybody tell about the sconstruction status there.
the land of the society is not transferred to the allottee and some time the builder takes loan by mortgaging the land. what happens if the builder does not repay to the bank and the bank auction it?
ReplyDeleteAt any given time land will be alloted to society only. If builder has mortgaged the land to a bank, then before taking possession, you need to confirm from them and builder need to pay to bank and get it released.
ReplyDeleteHi,
ReplyDeletePlease keep us informed once members start taking possession. I also got letter of Possession saying that electricity connection will be ready by August end.They have also given service tax as due amount.According to me Ashiana should pay service tax on balance amount since They have delayed the project. I was told for Possession by Dec 2009.
They also have added sinking fund. Any idea what is sinking fund.
Hi Guys,
ReplyDeleteToday on my 30th B'Day I finally booked my flat @ Palm Court. One of the greatest gift I could have got on any of my B'Days.
I have been allotted P1 1201. There were 3 reasons to it:
1. P1 would get the 1st possession in camparision to any other tower.
2. Though its on the higher floor, but I still feel that if you are in multi stories, you should enjoy the skycraper view from your balcony
3.They have told the possession for Nov 10, however based on the current situation I feel that atleast it should take Feb-Mar 11, before people can ideally move there.
There is a massive lack of basic amenities in the vicinity. Though Raj Nagar Dist Center is just 3 kms or 10 mins, for all your daily needs. But one cant travel everytime to RDC.
I heard that Landcraft is developing some commercial retail complex. Hope that it starts operations by Dec 10, so people can move on time.
By the year end, apart from Ashiana, KDP is expected to give possession.
SVP is just behind with Classic Residency which may give possession by Mid 11.
Rest all by End 11.
The construction work for the 45 mts road leading to Ashiana has still not started because of the monsoon. We need to get together to get a clarity on the issue, and if possible we can use each others contact to help get it started from GDA.
Feel free to add me to the mailing list with the following info:
Ashish Soni
P1, 1201
Indirapuram
ashish.soni.leo@gmail.com
I would be available anytime on the weekends for joint meetings.
Thnks.
Hi Ashish,
ReplyDeleteCongrats for gift you got for yourself. You took a nice decission.
I would suggest please don't say that P1 flat owners will get possession first. We all should be united.
Also I too have possesion letter with same dates as you (I am in P3) so possession will start for P1,P2,P3 at same time. Also not all people will opt for possession at same time (that's my believe).
Hi,
ReplyDeleteI still have waiting for the copy of my agreement.
I would be at 1st place to getting together with everyone for all the issues.
BTW, whats the Possession date on your letters.
We also need to chalk out how many people would be interested to move as soon as we get possession.
I suggest, we can do a tea party again to figure out all the issues, and take it to the Ashiana management.
I HAV 1 DOUBT. HOW MANY PEOPLE WILL BE ABLE 2 LIVE IN PALM COURT IN 2010? THERE IS NO AUTO/BUS/RIKSHAW SERVICE THERE. NO HOSPITAL/DOCTOR(EXCEPT BANGALI DAWAKHANA)/SHOPS FOR DAILY NEEDS NEREBY. I THINK WE MAY HAV 2 BEAR D BURDEN OF INTEREST FOR AT LEAST ONE YEAR DUE 2 LACK OF THESE AMENITIES.
ReplyDeleteI am Mr. Royal Burg, a renowned legitimate accredited moneylender. I
ReplyDeletereside in Belgium, we loan money to individuals and companies
who need financial need. If you are interested in this offer contact us
with this, E-mail below: royall.loancompany01@gmail.com
Kindly fill the below form and return as soon as possible with your
personal information.
Full names :*****
Address :*****..
City :*****..
State :*****..
Postcode :*****..
Country :*****..
Tel :*****..
Fax :*****..
Amount Needed: .. In USD or Euro/POUNDS(GBP) *****...
Mr. Royal Burg
Remittance Director
Citi Groups Belgium
Sincerely CEO,
Best regards,
friends what is the status of 45 mt road in front of Palm Court. Without that road reaching to our homes will be difficult. Ashiyana people are also unaware about the status of the road and the time lines. We need to come together and fight for speedy development..lets meet
ReplyDeleteI have a flat in P3 and I visited the site on Saturday. It was tough to go there on the day when the roads were blocked to help Kanwariyas. Anyway, I was happy to see the progress and the quality of the construction. I have deep interest in realty and generally visit a project or two every now and then. Trust me - Ashiana is giving a good project. The site layout, the flats layout on each floor looks very good. The work was going on in a steady pace so it is very certain that around Feb/March 2011, the habitants should come in - all the issues e.g. road, electricity, shops will damn sure be sorted by then. Trust me - a general store will pop up from nowhere just in time. I also liked the proximity of Ashiana to the Raj Nagar District Center. I have not visited Ghaziabad for over 10 years and I was pleasantly surprised. The other good thing was the quality of the 6 lane road - the naysayers should realize that the road is intact and has an expressway like feel even after heavy showers in recent past. GD Goenka and DPS should provide good schooling options as well. Its only a matter of time that the CNG autos start plying onto the six lane road. I had made this booking for investment and visited the site to decide whether its time to sell - frankly after looking at the area and quality of the project - I am holding on :-)
ReplyDeleteI agree with you.
ReplyDeleteBut what you have said is good for investment for long term only. For living it will take time as long as you see good return from your investment. You will get good return only after people starts living there and good connectivity to project. Link road to project is still not in this world and it is not in control of Ashiana as well. All is with GDA now and you know how GDA works!!!!!!
I don't have any doubt on Ashiana. They are good among others.
few Allotees are writing Negative things about Ashiana palm court like water connection. electricity connection, club construction, Quality of Construction , with out any authenticity.Requesting U all to visit personaly. U urself Will judge . and they are hampering the habitation in the society by discouraging others which will affect every body . Bcz For All common amenites like transport facilites , markets , habitation is Required.
ReplyDeleteI agree with u ,
ReplyDeleteEarlier they were crying that Builder has delayed the possession , now when builder has offered possession. now they are asking for clubs and market in near by areas i think there priorites are change . for them club is more important than Home.
the site construction is really encouraging , i am waiting for my possession letter so that i can move asap
What is status of Lifts.
ReplyDeletewe require everything ready at time because we paid for these things. as we paid for club membership etc. so we can demand these thise thngs at time.remember ashiana is not doing charity 2 us. but making wrong commitment they cheated us.when i visited d site during august,09 de told me dat the rd will be ready by 6 mnths. think we r paying both rent and interest now due to wrong commitment of the builder
ReplyDeleteIt seems - it would take long until power station installed. I am surprised, how & why asiana charging 30K bucks for each flat extra for electicity connection..
ReplyDeleteno body has paid for the club membership. it is due on the offer of possession. and club construction is already started. As per agreement only 95 % of cost has been paid by Alotees
ReplyDeleteBUT AT THE TIME OF ALLOTMENT ENTIRE AMOUNT IS TO BE PAID. HOW CAN THEY TAKE CLUB MEMBERSHIP CHARGES THOUGH IT'S PHYSICAL BENEFIT IS NOT GIVEN? HAVE U EVER SEEN THE SWIMING POOL IN THE COMPLEX? THEY MADE US FOOL.
ReplyDeleteCorrect...I too, not going to pay for services which are built in AIR and mentioned only on paper.
ReplyDeleteClub constrction alrady started !!!then why u paid for this flat? This flat was also in Air few years back.
ReplyDeleteCome on guys...Lets me matured enough, the more negative we say, the lesser number of people would move their.
ReplyDeleteTrust me Ashiana'a brand name is enough for us to rely on. I am sure they would keep up all their commitment.
But before we fight for our rights, its very important for us to take the possession at the 1st place.
SOME PEOPLE R TALKING IN FAVOUR OF BUILDER.R THEY REPRESENTATIVE OF BUILDER? WE RELIED ON D BRAND NAME OF ASHIANA AND THEY CHEATED US . DID NT HONOUR THEIR COMMITMENT.
ReplyDeleteCome on folks, show some maturity here.
ReplyDeleteBy doing this we are not only creating a negativity in the air, but also hampering the prospects of appreciation of the property cost.
The const work for the club has already started, and I am sure it would not take more than 3 months to complete.
The plan for swimming pool is still there.
And just a note, I am not from Ashiana, but an end user P1, 1201-Ashish Soni
I am in agreement with Ashish. We should not spread negativity about our own project. Friends citys can't be build in a ..day..look at Indirapuram what it was about 6 years back..it took at least 10 years for indirapuram to develop and its still developing..Development is a continuous process..we are still 2-3 KM from developed colony like Raj Nagar and Sanjay Nagar.
ReplyDeleteBut on the other hand we should keep on pressing Ashiyana for the development work which they have promised and we have paid for the same.
And I am also not from Ashiyana, But an end user P4.
Friends,
ReplyDeleteAshiana have updated the lastest pictures of the construction status on their website. Its looks impressive.
http://www.ashiana.co.in/ConstructionStatus.aspx?projid=3
Ashiana should post the Club House photo as well. I believe they have started constructing club also.
ReplyDeleteAshiana should post the Club House photo as well. I believe they have started constructing club also.
ReplyDeleteDear Mr. Anonymous,
ReplyDeleteWould you live in club or apartment?
Your eagerness to see the club shows that you have bought the space in the club rather than buying an apartment.
Currently Ashiana may be prioritizing to give the possession asap. And if you visit the site, the construction of the club has already started, and I am sure it wont take more than 3 months to complete.
Take an example of any society in Indirapuram. The club construction started after the possession was offered.
Here Ashiana is quite decent enough to start the construction last month, and I am sure by November it would be done.
Dear Mr. Soni,
ReplyDeleteI am not happy with your reply.
I just said they should show photos of club contruction as well. It doesn't mean i want to live in club.
Now I doubt that you are in which side. Ashiana's side or residents side. Please don't represent Ashiana.
Don't be too personal to someone. I have right to ask for what they are charging. Ashiana project includes club as well.
What is wrong showing eagerness. Don't you do it at various occassions of your life.
Dear Mr. Anonymous,
ReplyDeleteI apologize if my comments sounded too personal to you.
I understand you have a whole and sole rights to ask for what they have promised, and trust me I would be the 1st to represent the residents for their rights. All I wanted to say here, that if you consider any successful project across Delhi-NCR, you would find the club construction to be always behind the construction of flats.
At this point of time, we should be united to get the possession at the 1st place, as we all must be paying EMI's along with rent, and also not able to get the Tax advantage, as the property is still not occupied.
Once we all are their physically, we can surely push for things to be completed fast.
Just an FYI that the construction of club has already started, and looking at the pace, I guess it would be completed by the completion of P4 and P5 towers.
Hi friends any plan for meeting on this 15th Aug ????
ReplyDeleteThank you Soni. I am happy now.
ReplyDeleteFriends,
ReplyDeleteI am ready for meeting up on 14th, as on 15th most of the borders are sealed which would make difficult for some people to reach.
BTW, I would be there tomorrow in the afternoon, to check the progress.
If people cant make it, I'll try to get some pictures myself, and would share with everyone.
Rgds,
Soni
Hello All,
ReplyDeleteI am also visiting site tomorrow. It will be better if gathering is more.
Hi all ,
ReplyDeleteLots of discussion on this blog keeps me updated.I never visited our project after booking in 2007.But I am sure I will visit next months to do possession formality. I agree with Ashish that getting the possession is important fo Tax advantage.
I am really happy to see how communication was settled when someone felt hurt.
Really good to find such a matured future neghbour.Keep this spirit alive even after we settled over there.We will not have hot argument even if any one of our kid would break some one's window glass panel while playing cricket.
Just one question from my side, Have any one of us asked Ashiana for physical measurement of the flat area.Whether final constructed area is 1275 Sq feet or more or less.
As far as out side infrastructure is concern I beleive that we can ask GDA by when they are plaanig road front of our project.
Hi,
ReplyDeleteThe 1275 Sq Ft area is is total super area of the flat. The super area also includes, common galleries, staircase, balconies etc. The covered area of the flat is 996 Sq Ft.
Ashiana Palm Court on Google Maps
ReplyDeleteFolks,
I have added the location of Palm Court, to Google Maps today.
Earlier I tried searching, but it was not tagged.
I guess Google have taken the satellite pictures 1 year back, so the P4 and P5 towers are not visible.
Congrats our Den now has a online address aswell.
http://maps.google.com/maps?f=q&source=s_q&hl=en&geocode=&q=ashiana+palm+court,+ghaziabad&sll=28.382219,77.303093&sspn=0.274868,0.676346&ie=UTF8&hq=ashiana+palm+court,&hnear=Ghaziabad,+Uttar+Pradesh,+India&ll=28.711366,77.438507&spn=0.137006,0.338173&t=h&z=12&iwloc=A&cid=7417326883244500204
Make sure to zoom it, and let it buffer. View it in the satellite layer.
Guys,
ReplyDeleteToday I had word with one Ashiana Upvan resident and he confirmed that they didn't pay any electricity connection charges.
They just paid EEC(External Electricification Charges)whiich included (equipment & installation charges for Transformer, Panels, VCB’s, Cables, Pumps, Street Lighting &
Common Area Lighting)
Plus they paid Rs 15k/KW for power backup from DG and this was optional.
We should inform this back to Ashiana Palm Court as they said in last meeting on 14th Aug that they charged same amount of Rs 30K from Upvan as well as electricity connection charges.
I believe Ashiana is just taking advantage of his good name.
I request others if they also know someone at Ashiana Upvan and confirm same from them.
ReplyDeleteAs it is information from one resident.
Hi folks,
ReplyDeleteI would like to know whether we will have pre paid electricity meters as many societys of Indirapuram and vaishali are having?...Any information please share..
As I understand from the letter received from Ashiana that we will have prepaid electricity meter for which re-chrage coupen can be purchased from Ashiana Facility management
ReplyDeleteYes Ravi,
ReplyDeleteThe application form clearly states that the Electricity Meter would be prepaid.
Also it also states clearly that the residents have to pay extra for the electricity connection.
Friends,
ReplyDeleteWhat is the status of 45 mts connecting road leading to Palm Court.
Was this discussed during the meeting last week.
I guess looking at the current pace of work of GDA, we have to wait for another 1 year atleast.
This was discussed in last week meeting and Ashiana said, they don't have any control on GDA's 45mtr road construction.
ReplyDeleteNow I have got the letter for stamp duty.
ReplyDeletePlease tell me when any one of us is going to pay the balance amount & DD for stamp duty.
I am not aware when you people are planning to take possession.Your suggestion will help me in taking decision.How much delay I can do to give balance amount.Because I have to arange the money
Me too have got stamp duty letter.
ReplyDeleteThere is no end date mentioned in possession letter and same was confirmed by Ashiana in meeting at site on 14-08-2010.
Take your time to arrange for balance amount, however keep checking project status for living conditions like electricity connection, water supply, lifts, access to apartments etc.
As per Ashiana. Oct/Nov10 will be a good time to move there.
hi all
ReplyDeleteNo news, no exchange of views nothing going on.Every one is quite now.May be busy in arranging money to take possession.
Are you became so busy?Keep on exchanging views till we meet personally in the same society.
This site really give lot of information about the happening around our site.
HI Friends,
ReplyDeleteLets make a list of actual end users who plan to shift to Palm Court immediately, after the possession is offered.
This would actually help us to list the no. of people shifting there.
Here goes my name as the 1st.
1: Ashish Soni
A-1201, 9899466705
2:...
3:...
4:...
A dedicated website for Ashiana palm court residents have been created. It has latest issues, minutes of meeting, pictures and suggestion thread. Visit it at http://ashianapalmcourt.appspot.com/
ReplyDeleteAshiana Palm court
ReplyDeleteA dedicated website for Ashiana palm court residents have been created. It has latest issues, minutes of meeting, pictures and suggestion thread. Visit it at http://ashianapalmcourt.appspot.com/ or Ashiana Site
ReplyDeleteLet People of Ashiana Le Residency all create and come together thru these blogs. It is real help for palm court people.... gr8 job...
ReplyDeleteI would like to applaude for u all
http://ashianaleresidencyghaziabad.blogspot.com/2010/08/ashiana-le-residency-golf-links-nh-24_30.html
Guys , Supreme Court has released an order yesterday that from now on builder Can't charge for Parking as it comes under common area.This decision has come into operation from yesterday onwards.Hope to see Ashiana people implementing this as they have implemented service tax rule.
ReplyDeleteTrue.........We need to get into a meeting with Ashiana, and ask them for a refund....Subsiquently our registration and stamp duty would also reduce.......
ReplyDeletehttp://www.indianexpress.com/news/open-stilt-parking-spaces-are-common-areas-builders-cant-charge-extra-sc/676177/2
Some one discuss this with a lawyer & Clarification by lawyer is that Builders can still charge for parking
ReplyDeleteunder the special regulation given to them by which they can charge for a
common area from one individual if some special rights are assigned to
him/her (parking, gardening etc.)
Apparently the ruling says - developers cannot sell stilt parking as
separate flat areas. But it doesn't say that developers cannot charge
allocation fee from the flat buyers for special use of a section of this
common area.
Also Supreme Court has given the ruling in against a case registered in
Mumbai, taking into consideration the free space guidelines given by Mumbai
housing authorities. The court ruling has not clearly mentioned the
following -
1. If this ruling applies to entire India and will be treated a precedence
for every such case from now on across the country.
2. What happens to the allotment done prior to the ruling (our case).
*Personal View:* From what I understand, this again (like SERVICE TAX issue)
is a matter of individual interpretation, debate and seeking further
clarification from the court. Builders will surely not make this a cakewalk
for buyers - if they cant charge you for the garage, then be sure they will
charge you extra for the flat.
For reference you may read this -
http://www.expressindia.com/latest-news/allotted-parking-will-have-to...
Thanks and Regards
Ashwani Singh
Some information about RAJNAGAR, Ghazibad
ReplyDeletehttp://navbharattimes.indiatimes.com/delhiarticleshow/6539137.cms
Hi Guys,
ReplyDeleteDr. Rajesh Gupta, just booked P4/1115. Possession is promised in Nov 2010, planning to move there in April 2011.
Friends, After seeing all the properties in Rajnagar Ext, I can firmly say that Ashiana is the best. 45 meter road is key for further development there.
email: rajesh313@gmail.com
Correction: I have booked P3/1115 not P4/1115 as stated in earlier message.
ReplyDeleteHello Dr. Rajesh...you took a very good decision - Surendra Kumar (P3)
ReplyDeleteI got this news from somewhere
ReplyDelete"Something really good for the residents.....Ashiana has now named by Forbes as one of the 39 Indian companies to watch. Infact Ashiana has been the 1st in the Indian reality sector. Just thinking how DLF and UNitech left behind....hehe"
http://economictimes.indiatimes.com/markets/real-estate/news-/Ashiana-Housing-in-Forbes-list/articleshow/6558555.cms
Hi,
ReplyDeleteI have visited the site today and in my assessment the pace of work has slowed down a bit. The construction of club is in progress. Ashiyan has installed a gate at the entrance. The 45 mt road is nowhere and no time commitment for the same. The 6 lane link road is also not completed yet.
One family has shifted in P1 10th floor. The society looks good from inside that’s the only good news.
Thanks for the update Ravi !
ReplyDeleteI guess now only the residents have to fight to get the construction of 45 mts road started.
Now it completely depends how many people shift there asap, so that we can take a legal course of action against GDA
Dear All
ReplyDeleteI am in discussions with Ashiana authorities for buying a flat at Palm Court.
I was impressed with the exhanges made by future residents of Ashiana and the positives are strengthening my decision of going ahead with Ashiana. However, I still need advise regarding the following:-
1. Considering the start of EMIs/ monthly rents payable, I will have to shift as soon as possible after taking the possession. Optimistically, I plan to shift there by end Dec 10 at the latest. Though, with the news of one family already shifted, I get slight comfort. However, I still would like to have an opinion of guys who have tracked the progress till date!!
2. I read the issue of extra charge of electricity meter. Are you all paying extra to Ashiana for this?? Ashiana has informed me that this (Rs. 30,000/-) will be extra after possession.
3. Service Tax:- As my deal will take place after Jul 10, I think I have to bear this additonal service tax amount. Comments/ clarifications from any of you are welcome!
4. I need a clarity regarding availability of electricity connection from Grid, availability of water from muncipality, connection of society's sewerage system to municipal sewarage line!! Are these completed?
5. Any particular issues, which you feel I shall take care off during my final discussions and negotiations with Ashiana.
Thanks and regards
Ashwani
ashwanikaul6179@yahoo.com
Hi Ashwani,
ReplyDeleteI have recently booked a flat in Ashiana and can answer your queries:
1. One family is already staying in P1, 10th Floor. I have seen their car parked inside the complex. However, I think it is unsafe to stay there till the time construction activities are on. I am planning to shift there in April 2010 even though possesion is promised in Novemeber 2010.
2. I have also been asked to pay Rs. 30k for electricity meter connection charge & service tax on possesion.
4. I think electricity, water have to be provided by Ashiana on possesion otherwise whats the point of having the possesion. As far as sexerage system is concerned, work is in progress by GDA. Ashiana says they have water treatment plant done which is sufficiant for 20 years even without GDA's sewerage system.
Finally, I think you are making a good decision of buying a property in Ashiana.
Good luck.
CAN ANYONE UPDATE ME HOW MANY SOCIETIES R GIVING POSSESION APART FROM ASHIANA IN RAJNAGAR EXTENSION...IS LIVING THERE IS SAFE? IS THAT AREA LIVEABLE?
ReplyDeleteDear All,
ReplyDeleteI'm planning to shift during Diwali but concerned about my school going kids. Are we Ashiana residents planning to have a cab for pick up and drop for our kids studying in different schools of the city?
Vivek Saxena
vivek7saxena@gmail.com
Hi Vivek,
ReplyDeleteI guess the connectivity for the cabs and school buses, would be extensively easier, once the bypass is completed, as then the public transport would start plying.
All the Delhi bound vehicles would use the bypass, and I am sure, your kid's school bus must be also plying in GHaziabad.
Dear Ashish,
ReplyDeleteI understand that the bypass will take little more time to complete and till then public transport will not be available.
My kids study in Jaipuria School, Vasundhara and their bus route does not pass through NH 58.
I propose that we residents shall make some arrangement for pickup and drop of our kids till the time school buses starts to ply.
Vivek
Surely, we need to have a plan in place.
ReplyDeleteNow it depends, how many families move by Diwali, so that a pool can be done.
Do you have a list of residents expected to shift during diwali?
ReplyDeleteNOW WE HAVE ANOTHER DEDICATED SITE FOR PALM COURT RESIDENTS. I PROPOSE THAT THE DEDICATED SITE MAY BE USED FOR PALM COURT RESIDENTS AND DIS BLOG i.e. Ashianapalmcourtresidents.blogspot.com MAY BE USED TO SHARE THE VIWS OF ALL RESIDENTS WHO ARE GOING TO SHIFT TO DIFFERENT SOCITIES (INCLUDING ASHIANA) IN RAJ NAGAR EXTENSION AREA. I THINK THIS WILL HELP US TO DEVELOP OUR AREA AND 2 B FAMILIAR WITH EACH OTHERS
ReplyDeleteHi Ashish, Vivek and others
ReplyDeleteMy kid is studying in DPS, Ghaziabad which is right on NH58 itself, a 2.5kms distance from site. Currently I live in Rajnagar Ghaziabad.
I contacted Admin office of this school and they say that till they do not have sufficient numbers of kids, thier own bus service can't be started. However they also said that bus service can be started once that six-lane link road is complete at NH58 end which is yet not completed and in progress.
This is correct that we need to arrange some cab pooling till the time public transport is available on six-lane road.
Surendra Kumar
New pics have been uploaded to Ashiana website..Have a look..
ReplyDeletehttp://www.ashiana.co.in/ConstructionStatus.aspx?projid=3
Hi Guys,
ReplyDeleteAm in talks with Ashiana authorities to buy a flat. They r asking Rs24L for a 13th floor flat.
Is the price ok?
I like the project and the brand.I guess it will be livable by Mar11.
Would appreciate inputs n advice from blog members.Thanx
NSC
HI NSC
ReplyDeleteYou have not mentioned whether 24L is all inclusive or some thing extra also like car parking/club...
Hi Everyone,
ReplyDeleteThis is my first post for the blog,I have booked a
flat in tower p1(1002)December07.
I am planning to shift there by end of November10,
One family has already shifted on our floor.
Let me know how many of you are planning to shift
in Ashiana by November 10 end.
You can contact me on 9650145151.
Regards
(Rajat K Mathur)
You can call me RK.
hi everyone,
ReplyDeletei have recieved a letter from ashiana that service charge, maintenance charges to be paid from jan 2011..
is this ok or cheating..?plz advice
This is not cheating. They want to inform that AMC maintenance charge (which we have paid or will pay during possession for 2 year advance) will start deducting on monthly basis w.e.f. 01/01/2011.
ReplyDeleteIt means that either you shift or not, they will start maintenance charge with this date and now we have 2&1/2 month left. With this letter they wants to say that flat and project is ready to live.
thanks for advice..one thing more,this maintenance charges we have to pay extra per mnth or that is deductible from ifms? plz dont mind these silly questions . thanks in advance
ReplyDeletecan a builder strt demanding maintenance on his own will or they have to obtain certificate from gda in dis regard?
ReplyDeletehttp://www.indianexpress.com/news/So...transit/681630
ReplyDeletehttp://www.hindustantimes.com/High-s...e1-600249.aspx
High speed Rapid Transit (100 kmph ) will now connect Anand Vihar to Meerut. This will go through the Raj Nagar extn (NH-58 bypass) area and will be underground.
So Raj Nagar Extension to Anand Vihar will be a 10 mins ride on the high speed railway now
~Ashish
Correct Ashish. I read this news sometime back in some in NBT.
ReplyDeleteBut there is some bad news hidden with this. Now GDA is pulling itself from Metro rail project and putting this project (RRTS) in front.
>>>>Surendra
This comment has been removed by the author.
ReplyDeleteHi,
ReplyDeleteI booked a flat in Tower p1(1305). They told me that I will get possession in Feb or Mar 2011.
I was at the site recently and according to Ashiana people all 5 towers will go live by Feb-Mar2011.
Thanks to all of you who started this blog and provided updated information.
Great to know you friends.
Regards,
Amit Tanwar
8800704399
@NSC,
ReplyDeletePlease give the details of your price, segregation into various heads like BSP, PARKING Etc.
Thanks,
Amit Tanwar
Friends i have also booked a flat in P4 11th floor, lift is still not fitted in this tower, i had gone to see my flat by stairs. i want to know which bank is better hdfc or idbi for home loan purpose. somebody pl throw more light on the issue of RRTS. Is it confirm news that RRTS is coming to rajnagar extn. thanks
ReplyDeletewhat is the size of swimming pool. i have gone there to see but by seeing space for this looks very small
ReplyDeleteHi Balbir,
ReplyDeleteCongrats for your decision.
Hats off to you.....You walked all the way upto 11th floor to see your flat..WoW...
I recommend IDBI, being a govt bank, they reduce and increase interest rates strictly as per govt rules, unlike pvt bank who only increase and nvr reduces.
RRTS has been planned, but you know GDA well. It would take atleast 5-10 years to be up and running. B4 RRTS I am sure Metro would link up RNE
Hi friends I have also booked a flat in 1027 tower P5. I recommend HDFC bank the service is excelllent of this bank. Earlier I was also plannnin to take loan from IDBI then I come to know that this z a private bank. the government has a 60% stack in it . but all the functioning of this is not governd by gov't. comments plz.........
ReplyDeleteDr. Shivakar Sharma
shivakar@hotmail.com
Hi,
ReplyDeleteWant to share my exp with loan thing:
took the loan from AXIS Bank, A very good deal.
1st Year - 8.25%
2nd Year - 9%
3rd Year - Base Rate + 1% Margin
Processing Fee - Rs2500 + Tax
Margin is the most important factor in choosing the loan.
Loan sanctioned in 5days flat.
....
Also 4 family is residing now... I visited the site on 30th Oct2010.
Work is going quite slow.... little progress.
We have to plan a meet post Diwali with Ashiyana Authorities.
....
Moreover, work is vry slow on the 45meter road also... Ashiyana people do not have any answer.... They politely blame GDA.
Regards,
Amit Tanwar
8800704399
Friends, Happy Diwali To all of you.
ReplyDeleteMay this Diwali brings lots of happiness in your life.
Cheers!!!
Regards,
Amit Tanwar
8800704399
Hi Ashish, Soni
ReplyDeleteThanks for sparing your valuable time to answer my queries. I hope we will have a nice family atmosphere in Ashiana with the people like you.
And wishing all the residents of Ashiana Palm court A VERY VERY HAPPY DEEPAWALI. I hope next deepawali we all will celebrate together
thanks once again
BALBIR
visitin on 4 th nov. total four families is residing there and 10 families till now have taken possesion. hope till the end of the year there will be a lot of families there. The work of 45 meter road is slow.
ReplyDeleteHappy Deepawali ,Govardhan and bhaiya dooj to all members
Dr. Shivakar Sharma
Update:
ReplyDeletefinalisation work started on site...
- putting up plants around p3
- emptying garden area from debris
- GDA started work on 34 meter road, saw a road roller working on the same
- Ashiana people (pushpendra singh) says they will finish the work by march
further, he confirmed that 10 more families may move in soon (currently five living)
Looking for your updates and looking forward to an ALL resident meeting with Ashiana people.
Regards,
Amit Tanwar
8800704399
hi i am interested in ashiana palm court,flats on 11 to 14 floors are only left. pl tell me about the authorised floor of APC. is this floors are approved because air port is nearby and height of building is to be limited. pl tell me also the best bargain price for these floor. if sombody answers my query it will help me to take the decision
ReplyDeleteHi Dhruv,
ReplyDeletePlease post the quote you got from Ashiana. We will let you know if it is a good price or not.
By the way, the best thing about Ashiana palm court is, you can move to live there by March elsewhere it will take years... so lots of saving.
Regards,
Amit Tanwar
Hi All,
ReplyDeleteMay I request you, not to share the price bifurcation on a open public forum.
This would directly affect our APC Flats appreciation, and any person would come to know about the exact cost, when we would like to resell it.
This can be done over an email chain, including the current residents.
Hi Dhruv,
ReplyDeleteHeight of Ashiana towers and floors (11-14) are approved by authorities. Airport issue was considered (hoeever initially theu gave approval till 10th but lateron it was approved for Grounf + 14 floor)
can somebody throw some light on sewarage dump near raj nagar extn. how far is it from the residential area. Will it affect the environment there. and what about the road towards sonipat, i have not seen any road except which is going to meerut.
ReplyDeleteDo you want to purchase flat here or already purchased or just doing window shopping.
ReplyDeleteHey All, CNBC is airing Raj Nagar Ext. profiling today (20 th nov 10) at 5 pm. Show will be repeated on sunday 21st nov at 5 pm. dont miss
ReplyDeleteDr. Shivakar Sharma
Friends,
ReplyDeleteI am interested to sell my flat in P-4 tower at first floor. Please contact me at 8802999007 in case any one is interested.
Shaleen Jain
Hi All, can anybody tell me what was shown/told in telecast on CNBC about Rajnagar Extension. I missed this show.
ReplyDeleteHi,
ReplyDeleteThe show was more focused on SVP and High End infra's projects. For 15 mins there was SVP's CEO interview, who was just talking about his project. Though he stated that he see extensive growth in the area in next 1 years.
Also a short clip of interview with GDA Chief Engineer, who said, RNE is their priority.
There were few clips of APC, but the narrator still said that the possession of these would be next year.
~Ashish
Is there any update regarding 34 mtr road
ReplyDeleteI heard from some members here, that they have seen some road rollers around APC.
ReplyDeleteHowever Ashiana guys are saying the work would start by January, and wont take much time, as its hardly 1 km long.
Are there any news on availability of LPG gas pine line connection, internet, cable, drinking water-RO Plant in our Apartment?
ReplyDeleteHi,
ReplyDeleteThe LPG Gas line, has been already installed in each flat. The central processing plant is built up in the basement. Now Ashiana needs to award the contract to agency for the up-keeping.
For internet and cable, Ashiana has tied up with Airtel, for the Central IPTV(Telephone, Internet & DTH). Airtel has installed one central dish on each tower.
For water, there is a central RO plant in basement, as well as individual RO in each flat's kitchen.
Hope this helps.
Thanks,
Ashish
Planning to visit today.
ReplyDeleteThanks for your upto date information, Ashis
ReplyDeleteThis is Rutwik
Dear Friends,
ReplyDeleteI have not seen many a people writing in the forum that they will shift to Ashiana by Dec or Jan Or Feb Or March.
As per best of my knowledge, around 7 or 8 families are residing there.
Would appreciate if people here tell us that when they will shift?
All,
ReplyDeletePlease note that there is individual RO unit in each kitchen (Whirlpool make, 6.5 ltr storage water tank in it) will be given in each flat but no RO plant.
Believe me it is very good option as maintenance of central RO plant is very very expensive. They have intalled RO Unit in my kitchen.
You will get RO unit at the time you get possession and keys. With this, GCMPL manager will give you customer number of whirlpool, call this number, fix a time and whirlpool RO engineer will visit your flat and install.
SURENDRA KUMAR (P3)
I am willing to shift within a month (wood work would need that time) after getting the possession, hopefully by Feb-March 2011.
ReplyDeleteDr. Rajesh Gupta (P3/1115)
Dr. Gupta,
ReplyDeleteThanks for making me rememeber WOOD WORK.
Can we talk to somebody who can do WOOD work for a couple of people at a very reasonable price.
If anybody of you can, please provide the numbers.
I think everybody will do below mentioned wood work at a minimum level:
1. Kitchen Work
2. Wooden Almirah in all 3 bedrooms
Optional: Wood Work in main bedroom.
If you have any quotes, please share,
Regards,
Amit Tanwar
(p1/1305)
Hi Amit,
ReplyDeleteAs per my market research, here can be the 2 possible options for anyone:
1: Hiriing a contractor, to get the project done. Contrators usually charge INR 600/Sq Ft for a basic level material used, and INR 800-900/Sq Ft for good quality material used.
2: Hiring a carpenter for the entire work. Here is cost is split into 2 parts, 1: Carpenter labour cost and 2: Material Cost.
You should easily get a carpenter with the labour cost ranging from INR 150-200/Sq Ft.
A good mid-level material would cost you something in between 150-200/Sq Ft.
Now @ APC, most of the almirah spaces are ranging from 8 Ft height and 5 Ft breadth. Most people calculate the hieght up till roof i.e. 10 Ft. So the total area of each almirah would be 50 Sq Ft.
The kitchen work would be 30-40 Sq Ft total.
Now if the total area of woodwork would be 200 Sq Ft.
Going with contractor @ 600/Sq Ft would be: INR 1,20,000
Going with Carpenter @ 300/Sq Ft would be : INR 60,000.
Hope this helps everyone to do the calculation for Woodword
POSSESSION INTIMATION
ReplyDeleteHi All,
This is in reference to the possession intimation for all the people who bought it in last 1 year. Ashiana has already dispensed the 1st lot in August. However delaying the letter for the people in P1, P2 and P3, who bought it in last one year.
Has anyone got the possession letter recently.
Thank you Ashish for the information.
ReplyDeleteLet me ask one of the carpenter I know and will post his quote to all of you.
Regards,
Amit Tanwar
PS: 8 Families moved in and 26 others will move soon - as per Ashiana People.
This is great going...
HI ALL,
ReplyDeleteI M PLANNING TO SHIFT WITHING THIS MONTH
PLS KEEP ON UPDATING REGARDING WOODEN WORK OPTIONS
LAKSHMAN
P3- 815
9811354641
Hello to All,
ReplyDelete14 families moves in.
in P1- 9
p2&P3 - 5
just wanted to update you.